Attached are both documents for the 18 Seer and 20 Seer Bosch Inverters. These are to help assist in setup and startup of new units.
SW4-3 Function:
While in the off position (enabled) allows for coil/
condenser target temperature to drift +/- 4°F based
on previous hour of operation in an attempt to
optimize run time. Reason to Disable: In zoning
applications but only as needed as a result of
customer expectations and/or performance.
SW4-4 Function:
Reduces target coil temperature in cooling to 37°F
and increases target coil temperature in heating to
114°F. Recommended to be used only as needed as a
result of customer expectations and/or performance.
SW5-1 Function:
Functions allows for the equipment to enter defrost
sooner than normal. Used in northern cool climates
where high humidity is common.
SW5-2 Function:
Function allows for defrost cycle to be extended from
8 minutes to 9 minutes. Also used in cooler climates
where high humidity is common.
Manual/Force Defrost
To initiate defrost cycle:
1. System must have a call for heat and have been
operating for a minimum of 8 minutes
2. Press “FORCE” button on inverter board for 8
seconds to begin forced defrost
3. Wait approximately 40 seconds for defrost to initiate
4. Once defrost initiates the display will indicate “dF”
5. Defrost test will terminate automatically after which
the display will indicate running speed
6. If a second defrost test is required, repeat
step 2-5 after 5 minutes
Wiring Diagrams:
Here are the Startup Guides.

